Since 2010
Sockets, switches and lighting in Pontefract
Cornel Building Services fits sockets, switches and lighting across Pontefract, Knottingley, Castleford, Featherstone, Ackworth, Darrington and Wakefield, and has worked from Queens Avenue since 2010.
If you need an extra socket, a light fitting changing or a dead switch sorting out, call 01924 266211 and we will give you a price before anything starts.
If you are deciding where to put it, settle what you want to plug in there first, because that is what decides whether it is a simple spur or a bigger job.
Answered out of hours, every hour
A real person picks up 24 hours a day, 365 days a year. No voicemail, no call-back promise.
Lights out at midnight? Someone answers immediately.
You know the price before we start
You get a written price before any work begins, agreed with you, and we do not quote day rates over the phone or let the number grow once the floor is up.
Electrics, plumbing and roofing, one contractor
A lot of electrical faults start as water, and because we cover all three trades, the leak behind the fault gets fixed along with the electrics.
Who we work with
Homes, rentals and commercial property in Pontefract and surrounding areas.
The same trades, the same standards and the same written pricing whether it is a family home, a rental portfolio or a commercial building.
Homeowners
Repairs, replacements and improvements. Priced clearly before we start.
- ✓ Every trade under one contractor
- ✓ Free written quotes, no obligation
- ✓ All work fully guaranteed
Landlords and letting agents
Tenanted property looked after without you having to be there.
- ✓ Direct contact with your tenant
- ✓ Photographs and sign-off on every job
- ✓ Gas and electrical certification
Commercial and healthcare
Maintenance and repairs planned around the people using the building.
- ✓ Out of hours attendance
- ✓ Work planned around occupants
- ✓ 24/7 emergency cover, 365 days
Outside power and the smaller swaps can usually be taken off a circuit that is already there, which keeps them small jobs.
Outside sockets, lights and smaller swaps
Outside sockets
An outside socket for the mower or the jet wash is usually taken through the wall from a socket on the inside, and it goes in weatherproof and RCD protected.
Outside and security lights
A wall light by the door or a PIR security light can usually be fed from the lighting circuit inside, and we set the sensor so it covers the path and the drive without catching the road.
Lighting under kitchen units
Lights under the wall units are far easier to wire before the tiles go on, and in a kitchen that is already finished, the cable can usually be hidden along the top of the units and dropped down behind them.
Damaged sockets and switches
A socket that is cracked, loose in the wall or scorched around the pins is a straight swap, and a scorched one gets the connection behind it checked as well, because that is usually what caused it.
USB sockets and new finishes
A socket can go back as a USB socket, or in brushed steel, black or brass to suit a room that has been decorated, and because some USB sockets need a deeper back box, it is worth us checking before you buy them.
Moving a socket or a switch
Moving a socket along a wall or lowering a light switch is usually a short cable extension, and the old box is filled and left ready to decorate.
Two sockets in the same house can be very different prices, because what decides the cost is the route back to the board rather than the socket on the wall.
Extra sockets, and where they can go
Most extra sockets are taken as a spur off an existing circuit, which keeps the work and the price down. What decides it is where you want it and what is going to be plugged into it.
Back to back with an existing socket on the other side of the same wall, which is the cheapest there is
Along the same wall, where the cable can run in the floor void or behind the skirting
Above a worktop, where the run is short but the chasing is into a tiled or solid wall
In a garage or an outbuilding, which is a different job because it leaves the house
Anywhere a high load is going, like an oven or a shower, where a spur is not the answer
We will tell you which of those yours is before we start, because the first and the fourth on that list are not remotely the same piece of work.
Why one socket costs more than another
None of that can be priced over the phone, so we look at the job before we price it.
Where it goes
What makes it cost what it does
Back to back with an existing socket
A short cable run and one hole through the wall
Same room, cable in the floor void
Lifting and relaying flooring, which is most of the time on the job
Solid wall, chased and plastered
Cutting the chase, then making good and leaving it ready to decorate
Across a landing or upstairs
The run is longer and the floor is usually carpeted
A dedicated circuit for a high load
A new run back to the board, which is a bigger job and priced as one
Switches that have stopped working
A switch that does nothing is usually the switch itself, a loose connection behind it, or the lamp it feeds. All three are quick, and all three look identical from the hallway.
Two-way switching, where a light is operated from both ends of a landing or a hall, fails more often than a single switch, because there is more in it to go wrong. If one end works and the other does not, that narrows it down before we arrive.
Light fittings and what the ceiling will take
Swapping a fitting is quick where the ceiling rose is sound and the fitting is light. It stops being quick when the new fitting is heavy, because a plasterboard ceiling will not hold a chandelier on the existing fixing and needs something to screw into above it.
On lath and plaster ceilings, which plenty of the older houses here still have, the fixing is the whole job. We fit a timber pattress above the ceiling, so the weight never hangs off a hundred year old lath.
Downlights, and what goes wrong with them
Downlights fail in more ways than the lamp: the driver behind an integrated LED unit goes, the connector block above the ceiling loosens with heat, or the fitting was never rated for the insulation that has since been laid over it in the loft.
That last one is worth knowing about, because loft insulation pulled over an unrated downlight is a fire risk, and if we are up there anyway we will check whether yours are rated for it.
LED lamps, dimmers and flickering
Since LEDs took over, a lot of flickering comes from an LED lamp on a dimmer that was made for filament bulbs, and changing the dimmer cures it without anybody chasing the circuit.
We check that first because it is the cheap fix, and flicker across several rooms is a different problem, which is covered on the fault finding page.
Kitchens, and the sockets people regret
The usual regrets after a new kitchen are too few sockets, and sockets that sit behind an appliance where nobody can reach the switch. Both are easier to sort before the units go in than after.
If a kitchen is being planned, think about the kettle, the toaster, the microwave and whatever charges on the worktop, and then add two more. Sockets added at first fix cost a fraction of sockets added afterwards.
Chasing, and making good afterwards
Agree where the cable runs before anything is lifted or cut
Cut the chase, run the cable and fix the back box
Fill the chase, sand it and leave it ready for decoration
Put floorboards back with screws rather than nails, so the next visit is easier
Refit skirting and architrave rather than replacing it with a near match
Clear up and vacuum the room before leaving
The mess left behind is what people remember about electrical work, and because the same firm does the building trades, the making good is our job too.
What it costs
You are told the callout before we set off, and anything beyond it is priced in writing first. Small work like a switch, a fitting or a back to back socket is usually done inside the first visit. Our pricing and process is set out in full.
Where we cover
We work from The Stables, Queens Avenue, Pontefract, WF8 4SF, and cover Knottingley, Castleford, Featherstone, Ackworth, Darrington, Normanton and the wider Wakefield district. We also cover Ferrybridge, South Elmsall and Upton. For the full picture there is our electrician page.
Need an electrician?
Tell us what you want and roughly where it is going, and we will come back to you with a time to come and look, then a written price.
Recommended Seasonal Jobs
Winter is coming - get your home ready now.
Plumbing
Keep your pipes flowing smoothly and avoid nasty surprises this winter.
Heating
Stay cosy - book a Cornel heating check before the cold sets in.
Roofing
Fix small problems now for a roof that can stand up to winter weather.
Radiators
Upgrade your home with new radiators for warmer, more efficient heating.
Gutters
Clear away autumn leaves and prevent blockages before heavy rain and frost.
Boilers
Keep your boiler running safely and reliably when you need it most.
Electrical
From lighting to safety checks, our electricians keep your home powered up.
Chimneys
Enjoy safe, crackling fires with a freshly swept chimney this winter.
FAQ
Frequently Asked Questions
Clear, honest answers to the things people ask us most. If you can’t find what you need, just get in touch - we’re happy to help.
Can you put a socket anywhere I want it?
We can put one nearly anywhere, and where it goes is what decides the price. A socket back to back with an existing one is the cheapest there is, and the same socket on the far side of the room in a solid wall is a different job because of the chasing and the making good.
How long does an extra socket take?
It depends on the route the cable takes, and a back to back socket is the quickest there is. One that needs a cable run under a floor or chased into a wall takes longer, because the time goes on lifting, chasing and making good, and we will tell you which yours is before we start.
Will you chase the wall and leave a mess?
We chase where there is no other sensible route, and we fill it, sand it and leave it ready for decoration. Floorboards go back with screws rather than nails and the room is cleared and vacuumed before we leave.
Why does the landing light work from one switch but not the other?
That is two-way switching, and it has more in it to go wrong than a single switch. Telling us which end works narrows it down before we arrive, and it is usually the switch or a connection behind it rather than the light.
Can you hang a heavy light fitting on a plasterboard ceiling?
We can, once there is something solid above the board to screw into, so we fit a timber pattress in the ceiling void and hang the fitting off that. On a lath and plaster ceiling the fixing is effectively the whole job.
Why do my LED downlights keep flickering?
Often it is an LED lamp on a dimmer built for filament bulbs, and changing the dimmer cures it, so we check that first. Flickering across several rooms is a different problem and gets looked at as a fault.
Can you put sockets in before the kitchen goes in?
Yes, and it costs far less at that stage than once the units and the tiles are in. Tell us where the kettle, the toaster and the microwave are going and we will plan the sockets around them, with a couple spare.
Do you do small jobs, or is there a minimum?
We do small jobs, and if you have two or three of them, say so when you ring, because they cost less done on one visit than spread across three.
